Engineering Drawings


Click to enlarge

     
Date of installation   22 November 1985
Nature of construction   Galvanised Steel, RHS
Foundation   Concrete set into local rock, 2 metres below surface
Power Source   Solar panel model n
    Converted to solar October 2000
     
Maintenance History Performed by    
July 2001 Group Alpha   serviced solar power unit
January 2002 Group Alpha   serviced solar power unit
August 2002 Group Charlie   serviced solar power unit, paint structure
December 2002 Group Alpha   repair collision damage
July 2003 Group Alpha   serviced solar power unit, paint structure
January 2004 Group Alpha   replace batteries and light, minor damage to ladder
August 2004 Group Alpha  

serviced solar power unit